Overview
New work that has to live with an old house.
Adding on is not the same job as building new. On a ground-up home, the electrical starts from nothing and everything downstream is designed together. On an addition or a remodel, the house already has a service, a panel, a set of circuits, and whatever wiring practice was normal the decade it was built - and the new primary suite, bonus room, or opened-up kitchen has to work with all of it.
We take these projects from homeowners directly and from the general contractors running them, and the electrical questions are the same either way. Can the existing service carry the finished house? Is there physical room in the panel for the breakers this will take? What is actually in these walls, and will the new work tie into it cleanly? Which existing circuits get modified, and what does current code require once we touch them?
Those questions have honest answers, and the right time to get them is before demolition - not in week six when a wall is open and the panel turns out to be full. That's the single biggest difference between a remodel that runs smoothly and one that stalls: we evaluate the existing system up front, price the real scope including a service upgrade if one is genuinely needed, and then work inside the sequence your contractor has already built.